the windows

So the whole reason why the kitchen project escalated to what it became was because I wanted some larger windows.  I wanted light.  Lots of it.  Its hard to be home with the kids during the winter and it be so dark.  It brings a girl down.

Looking back, a lot happened this week.  Trev did a lot of plumbing.  He moved the sink from under the left set of windows to under the right set of windows.  If you look at the after pic, that's anna probably dumping something down the old pipe...either that or sticking her finger in a socket.  Who knows.  You can see he created a new smaller soffit.  He did a ton of electrical...we added a lot of sockets.  Plus, electrical for the lighting was completed for the drywallers.  He insulated and added vapor barrier.

He basically completed all the guts of the project.  I say basically completed because I won't get into the biggest issue we had in the this escapade we call a kitchen renovation.  Lets just say we have a stronger marriage then we probably thought we did...

Oh, and the contractor came in and added the windows.





***************************************************************************





***************************************************************************





***************************************************************************





tammyComment